Chapter 9.12
CONSTRUCTION SITE TOILET FACILITIES

Sections:

9.12.010    Facilities required during construction.

9.12.010 Facilities required during construction.

Before the construction of any building or structure is started, a temporary water-flushed toilet or an approved chemical toilet shall be maintained throughout the construction of the building or structure. If a water-flushed toilet is used, the toilet shall be connected to the sewer and tile pipe without a vent may be used for the installation. The person in whose name the building permit for the construction has been issued is charged with the requirement for providing the temporary water-flushed toilet or approved chemical toilet and is charged with the requirement of maintenance of the facilities during the course of construction. (Ord. 3043 § 2, 1963).