SS-20-01 and SS-20-02 AM-WRF Compost and Dewatering Improvements ARCHIVED
Due:
March 30, 2021, at 2:00 p.m.
Project questions:
Nolan Nelson, 541-791-0130
Documents
It is imperative to follow the procedures as outlined in the documents posted here or your submission may be non-responsive.
- Invitation to Bid SS-20-01, 119KB pdf
- Contract Documents SS-20-01, 630KB pdf
- Appendix A Technical Specifications SS-20-01 REVISED SPECIFICATIONS PER ADDENDUM 1 , 4MB pdf
- Appendix B Dewatering Drawings ss-20-01 REVISED DRAWINGS PER ADDENDUM 3 , 23MB pdf
- Appendix C Composting Drawings SS-20-01 REVISED DRAWINGS PER ADDENDUM 1 , 8MB pdf
- Appendix D - Designation of Major Equipment or Materials Manufacturers SS-20-01, 60KB pdf
- Appendix E - Claims and Disputes SS-20-01, 75KB pdf
- Addendum 1 SS-20-01, 340KB pdf
- As-built Drawings Volume 1 326918, 9MB pdf
- As-built Drawings Volume 2 326918, 13MB pdf
- As-built WWTP-99-01, 22MB pdf
- Geotechnical Report, 7MB pdf
- Addendum 2 SS-20-01, 91KB pdf
- Addendum 3 SS-20-01, 95KB pdf
- Plan Holders SS-20-01, 26KB pdf
- Bid Results SS-20-01, 2MB pdf
See also: City of Albany Standard Construction Specifications
Plan holders list
This page does not track who downloads the RFP documents so you will need to contact the City of Albany as an interested proposer or periodically check this page in order to receive any available addenda or clarifications.
To be added to the plan holders list for this project, call 541-917-7676.