Deerfield Park Improvements
These upgrades will make Deerfield Park an even better place for play, exercise, and community!
- Estimated start date: May 27
- Estimated completion date: October 15 (weather permitting)
- Contractor: Durbin Excavating
NEW universally-accessible, ADA-compliant:
- 8 ft. wide permeable concrete pathways with new connections to adjacent neighborhoods
- Soft-surface perimeter walking trail
- 6,500 sq. ft. play area with new equipment and artificial turf safety surface
- Picnic & seating areas, drinking fountain, and full-size basketball court
- Permanent 9-hole disc golf course
Improving the existing natural features:
- Added trees for more shade, while keeping all existing trees
- Retaining and repairing existing grass areas
Parking
Clearly posted signage around the perimeter indicates the preferred parking area (for approximately 60 vehicles) on the north side of the park on Del Rio Avenue SE.